Sample Questions:
Which of the following ATP assertions (available to promise) the components of the materials are correct? (Choose two.)
ATP tests are automatically carried out during MRP works (material requirements planning).
The ATP check can also be adjusted also takes the needs and future income.
ATP tests are used to evaluate free space at a specific workstation.
The ATP check can be done automatically when it releases the production order.
What options can you offer the SAP ECC System user to control costs (costs and payments) with respect to production orders? (Choose two.)
Calculation based on a series.
Working on the basis of the calculation center.
Order on the basis of the calculation.
Cost of collection products
The project team member analyzes the following situation in SAP ECC in the requirement / stock declaration for the finished product: there is only one client order and a fixed planned order with the same amount of quantity. An order of sale and a planned order, since there are deadlines on the days of the week, but not on the same working day; The planned order has a later date. The project team member can not find a restructuring message with a link to this term imbalance in the requirements / list of values. What reasons can not miss the message? (Choose two.)
Requirements planning has not yet been carried out to update the reprogramming of the message.
These elements are connected to each other through a fixed plug.
The time mismatch is inside the tolerance window defined in the customization.
The element's coverage requirement is beyond the horizon of debt maturities.
When customizing for planning requirements, the project team indicates that the alternative P1, P2, P3 and P4 is also available as standard as well as MRP type PD. The number in each of these alternatives is a type of restoration. What kind of reaffirmation identity? (Choose two.)
Processing of existing proposals on acquisitions during the planning time guide.
Managing the new Proposals on Acquisitions, which must be established in relation to the new requirements within the planning time fence.
Processing of existing proposals in shopping out of time Planning the fence.
Management of new requirements within the planning time fence.
In what order are the planning of material requirements of the individual steps in SAP ECC?
1. The calculation of the net requirement 2. Use the calculation procedure of the batch size 3. Planning 4. Determine the type of acquisition
1. Availability 2. The use of the Lotelo3 size procedure. 4. Determine the type of procurement planning.
1. Security calculation Stock2. The use of the Lot size calculation procedure 3. Planning 4. Determine the type of acquisition
1. Calculation of net requirements 2. Application Loteling Size Procedure 3. Determination ProcurementType 4. Planning
None
Which of the following master data is required to process the production order when the redundancy of materials and operations for bandwidth requirements should be generated automatically? (Choose two.)
routing
Characteristics of the inspection
Document structure
Registration Master Material (Product and material component)
In the course of the client's project, it faces the SAP ECC system, which shows the error message shown below when verifying the requirements they plan on the 1000 plant. A large number of materials already available on the 1000 floor. As First step in solving a problem, you activate the Planning Planning requirement for the 1000 plant. What are the following steps that will be taken before configuring the requirement plans on the 1000 plant for use in SAP ECC?
- Implement files that plan customization, specify the plant for the 1000 plant in the customization
- Strengthen planning to establish MRP Areas Requirements at Floor 1000: Specify plant parameters for plant 1000 in requirements planning types
- Implement planning files on the customization: Specify the parameters of the plant for the 1000 plant in the types of requirements planning
- Create file planning Customization: Specify the parameters of the plant for plant 1000 in the customization
None